The iMagic centralized control service backend Phase III project has been launched. The following functional requirements are to be completed in this phase.
|
Backend page |
Login |
Add account and password login,(the login page must automatically adapt to the mobile screen size to make login easier) |
|
Map page |
The map page adds the total number of devices under the account, online devices, offline devices, dormant devices, faulty devices, etc. |
|
|
Organization chart |
Add an organization chart. If the devices under this account have not been grouped, only all devices are displayed; after grouping, the organization chart of the groups is displayed. |
|
|
Control page |
On the console page, device management provides a sorting feature that can sort by device name, status, CPU usage, etc. (the page also needs a search function that can search by device name and MAC address) |
|
|
Add device management and device grouping to the console page |
||
|
On the console page, add an analytics page, using Ant Design components and charts to display the analysis data, including the total number of devices, online devices, offline devices, and device power-on duration statistics, software usage statistics, etc. |
||
|
Fault reporting |
Add a fault reporting section that provides a device repair reporting interface, can receive repair requests from the front end (the client) and shows the repair status; (the same as points 3-(5) of device control) |
|
|
OPS |
OPS |
Add OPS device data reporting (CPU usage, memory usage, bandwidth usage, IP address, C drive usage) |
|
OPS device control |
Open OPS applications on the device |
|
|
Adjust device volume |
||
|
Lock screen control |
||
|
Application blocking |
||
|
Fault reporting |
||
|
System restore |
||
|
Voice call feature (provided by a third-party SDK) |
When creating a room, you can choose whether to enable the voice call feature |
|
|
File transfer |
Provide a file transfer feature when in a room |
|
|
OPS binding to an all-in-one device |
In the backend, find the all-in-one machine and enter the OPS MAC address to complete the binding. If this OPS is already bound to another all-in-one machine |
|
|
On OPS use the binding mini program and enter the MAC address or serial number of the all-in-one machine to complete the binding. If this all-in-one machine |
||
|
NFC card binding to DrawView account |
NFC card: when writing a card you can choose whether to bind it to a DrawView account. When binding a DrawView account, enter the account password for |
|
|
To unbind a DrawView account, go to the NFC management section and click to unbind the DrawView account; the system notifies the DrawView backend |
||
|
NFC card swipe feature description |
When the all-in-one machine is powered on, unlocked and on the OPS channel, an NFC card swipe notifies the iMagic backend, which finds the |
|
|
Add a "Customer account management" menu |
The backend must be able to add customer accounts (currently only IMAGIC order management and user management are open; other features may or may not be opened, and customers can only see their own orders); when a customer account enters the map, only devices from its own orders are visible, and customer accounts can create their own customer sub-accounts |
|
|
The send command window interface needs to be redesigned |
The send command window interface needs to be redesigned |
|
|
Entering the map with an order number does not allow sending commands or performing operations |
Entering the map with an order number does not allow sending commands or performing operations |
|
|
When viewing the map of all devices, only super users can perform all operations; other accounts can only view tracks and information and cannot perform operations or send commands |
When viewing the map of all devices, only super users can perform all operations; other accounts can only view tracks and information and cannot perform operations or send commands |
|
|
Add a "Global device management" menu |
Query all devices, and the functions are the same as the IMagic order device management |
|
软件开发咨询
在线沟通,请点我在线咨询
咨询热线:
13412889989
