High-End Custom Software
13412889989
Solutions / MES solution

MES solution

MES is a production management information integration platform for manufacturing enterprises. It connects the microcomputers, mobile terminals, RFID/barcode devices, PLCs, and sensors at each work point with the industrial Ethernet, enabling real-time collection of production data and process control.

Real-time collection of production dataTraceable manufacturing processIntegration with ERP / SRM / OA and other systems
01

Overview

Production decisions backed by data

The value of MES lies in collecting the key data of the production process in real time and dynamically, integrating automated equipment wherever possible, and controlling the process itself. This makes production decisions transparent and the manufacturing process digital, which in turn improves product quality and customer service.

02

Product features

A focus on efficiency, quality, and implementation pace
01

Manufacturing efficiency

  • Helps improve first-pass yield
  • Helps increase output capacity
02

Quality improvement

  • Helps reduce nonconformance reports (NCR)
  • Helps lower the on-site failure rate
03

Faster returns

  • Can be rolled out in phases, keeping the implementation cycle relatively manageable

Why choose JIABEI

For manufacturers, JIABEI MES suits a wide range of manufacturing scenarios, and the solution has the following characteristics:

01

Scalable

Functions expand step by step as the company grows, helping maintain relatively stable operating performance.

02

Progressive

Suited to global manufacturing operations across different regions and scales.

03

Flexible

Configuration can be matched to a company's existing ways of working, reducing the cost of process change.

04

Proven in practice

The solution is already in use on manufacturing floors and can be adjusted to the characteristics of each industry.

05

Consulting services

We provide experienced implementation and consulting services to help projects get off the ground.

06

Standard validation package

Standardized validation documents and processes make compliance acceptance easier.

07

Predictable results

Implementation results are tracked with quantifiable assessments, making periodic reviews easier.

08

Reference customer base

A base of reference customer cases makes it easier to draw on experience from similar scenarios.

The path to efficient operations

Turn paper-based manufacturing and quality processes into an electronic manufacturing compliance platform:

  • Paperless shop floor
  • Reduced compliance risk
  • Leaner processes
  • Greater work-in-progress traceability and visibility
03

Advantages

Covering the key links of integration, transparency, and digitalization
01

Integrated information

Integration with ERP, SRM, OA, HR, CRM, and other systems carries business data between departments, suppliers, and customers, improving collaboration efficiency.

02

Transparent production process

Production data is collected, compiled, and analyzed automatically, feeding back production and quality status in real time so problems can be spotted early and root-cause analysis and improvement can begin.

03

Traceable products and production process

The manufacturing process, equipment operating status, and quality status are monitored and managed visually, helping reduce scrap, rework, and nonconforming events and raising output efficiency.

04

Product quality under control

Product manufacturing quality is monitored, with support for online or offline SPC analysis, so quality alerts can be raised in time and the production process improved.

05

Connected equipment

Data collection links equipment to the system, putting control in place at the point where production operations are performed, including program compliance handling, material use, operator training, equipment maintenance, and data collection verification.

06

Digital manufacturing

It closes the digital execution loop of “plan—execute—monitor—feedback”, helping raise capacity and business returns with the same resources.

Want to learn more about the MES solution?

We provide solution consulting and custom development, planned around your actual business scenarios. Let's talk through your requirements.

Contact us