Wireless connection: the smart air purifier hardware device connects to your phone over wireless technology.
Mobile app control: the app on your phone acts as a remote control for switching the smart air purifier on and off and for selecting function modes.
Real-time air data: oxygen, carbon dioxide, PM2.5 readings, temperature and humidity — keep track of the air data in real time.
Function mode selection: sleep mode, powerful purification mode and auto purification mode — a range of mode options that suit different usage scenarios.
Actual interface and delivered results


















软件开发咨询
在线沟通,请点我在线咨询
咨询热线:
13412889989
