High-End Custom Software
13412889989
Management software products

MES (Manufacturing Execution System)

Production control and visual dashboards

JBMES can be flexibly configured around the way your factory actually runs. Every role in the factory can quickly get the data it needs to collaborate, helping you better improve real production efficiency and quality. With full command of production demand, production resources, and production goals, you fully unlock the advantages of information transparency and face every production challenge with far more confidence. Make manufacturing data-driven and complete your upgrade to a smart factory.

•

Advantages and features

Publish production tasks online, take jobs and report work from mobile, and cut communication costs

Cloud data updates in real time, so production progress is easy to control and delivery dates are more accurate

Exception alerts are pushed automatically to the responsible people for priority handling

Smart report aggregation makes production data easy to trace

Real-time reminders on inspection tasks help ensure nothing is missed

Custom inspection standards flexibly adapt to different inspection needs

Inspection results support photo uploads for intuitive feedback on problems

Scan a code to bind inspection reports to production batches and quickly trace quality back to its source

Real-time records of equipment operating efficiency for predictive maintenance

Support on-site photos, voice, and text records with real-time feedback

Maintenance tasks are pushed to mobile so repair and upkeep respond fast, with on-site code scanning to retrieve equipment information

5. Material management

Scan codes to view material status and reduce operating errors

Barcodes and QR codes make raw materials and finished goods traceable

Scan with a phone for inbound and outbound stock to avoid inaccurate inventory

Work-in-progress inventory is queryable for more accurate inventory planning

1. Manage production operations efficiently: digitize people, machines, materials, and methods, and keep standardized records under smart management

2. Production management

  • Visual automated production scheduling that adapts to diverse production needs

3. Quality management

  • Control the inspection process in real time to reduce the defect rate

4. Equipment management

  • Fully electronic, standardized equipment ledgers for easy traceability and analysis

6. Production dashboard: production data is passed on more accurately to scientifically guide manufacturing

7. Quality dashboard: find quality problems fast and raise the yield rate

8. Material dashboard: monitor equipment status and improve operating efficiency

•

Five advantages that set it apart from other industrial software

Lower than traditional industrial-grade software

risk, charged by usage volume

Deliver customized configuration with agility

devices, friendly interface, simple operation

data import and export plus extended development

1. Easy go-live

  • Implementation and training time far

2. Pay as you go

  • Lower one-time project investment

3. Flexible configuration

  • No developers to keep on staff,

4. Simple to operate

  • Supports web, mobile, and IoT

5. Standard interfaces

  • Provides API interfaces, supports

Learn how MES (Manufacturing Execution System) is deployed and where it applies

We can run through an assessment together with your business scale, process characteristics, and integration needs. You are welcome to get in touch.

Contact us