High-End Custom Software
13412889989
Management software products

Advanced scheduling system

Lean production scheduling and resource allocation

Lean production is a just-in-time (JIT) way of working that lets the production system adapt quickly to constantly changing customer demand and trims everything useless and redundant out of the production process, so that ultimately every aspect of production, including marketing and supply, delivers better results. JIT sets out to produce what is needed, in the quantity needed, at the moment it is needed, eliminating all waste and moving toward zero defects and zero inventory.

2. Higher production efficiency: optimizing the schedule of resources minimizes waiting time and changeover time and raises production efficiency. The full use of barcodes cuts non-productive time on the shop floor and makes data more timely and accurate.

3. Lower inventory, pursuing zero inventory: the timing and quantity of material demand are calculated very accurately, and a genuine JIT model reduces the stockpiling of raw materials; semi-finished production runs like an assembly line, with each process tightly linked to the one before and after it, reducing work-in-progress inventory; finished goods are completed at almost exactly the delivery date, reducing excess stock.

4. Better overtime arrangements and higher employee satisfaction: based on the scheduling results, overtime hours and compensatory time off can be planned in advance (for normal working days with insufficient workload, leave or time off in lieu can be considered).

5. Optimized staffing: material requirements and production scheduling are calculated automatically by the system, which further reduces the workload of planners and order-tracking staff, and the operation is simple enough that it can be handled without extensive industry experience.

6. Higher product quality, pursuing zero defects: quality is built in, not inspected in. Inspection is only an after-the-fact remedy — it is costly and cannot guarantee that no errors occur. Quality should therefore be built into design, processes, and manufacturing, creating a quality support system that does not go wrong, getting it right the first time.

Zhenkun lean production mainly helps companies solve the following key problems:

  • 1. Meeting order delivery dates and delivering on time: no early production and no late delivery, accurate delivery dates can be given to customers at any time, the production cycle of products is shortened, and the company can respond quickly to constantly changing customer demand.

Learn about deployment options and applicable scenarios for the advanced scheduling system

We can assess it together with your business scale, process characteristics, and integration requirements. You are welcome to contact us.

Contact us