High-End Custom Software
13412889989
Human resources outsourcing case · 2025-04-11

7-Person On-Site Team Helps Drive Digital Transformation

JIABEI Software and Guangdong Blue Origin Business Management Co., Ltd. have formally signed a strategic cooperation agreement, under which JIABEI Software will provide the latter with on-site services from seven senior test engineers, fully supporting the testing optimisation and quality assurance of its core business systems. This cooperation is a major move by both parties in the field of digital transformation, and marks a further rise in JIABEI Software's professionalism and industry influence in software testing services.

7senior test engineers on site
5+ yearsaverage industry experience of the team
40%improvement in defect prediction accuracy
20%shorter delivery cycles

A Powerful Alliance: The Inevitable Choice for Digital Transformation

Client background and challenges

As a well-known business management group in China, Guangdong Blue Origin covers retail, food and beverage, amusement parks and cross-border e-commerce, with a particularly deep presence in the Southeast Asian market. As its business scaled up rapidly, its core business systems faced complex testing challenges such as high concurrency, multiple scenarios and cross-platform operation. Drawing on its extensive experience in enterprise-grade software testing, JIABEI Software became its strategic partner.

"We studied Blue Origin's business scenarios in depth and found that its systems must simultaneously support real-time data exchange across 66 stores in Indonesia, high-concurrency transactions on its cross-border e-commerce platform, and precise scheduling for its amusement park ticketing system. These requirements place extremely high demands on the comprehensiveness, real-time performance and stress resistance of testing."

— Technical Director, JIABEI Software

A 7-Person On-Site Team: Professional Services That Upgrade Quality

Core service highlights

The test team stationed on site consists of seven test engineers (SDETs), all with more than five years of industry experience. The team adopts a "full-process quality control" model that covers the entire chain from requirements analysis, test design and automated execution through to defect management, safeguarding system quality from the source.

AI-Driven Intelligent Testing

Tools such as TestGPT are introduced to generate and maintain test cases automatically, raising defect prediction accuracy by 40% and effectively reducing the manual effort spent on regression testing.

Security Penetration Testing

Black-box penetration testing is carried out on core systems. During testing of the store management system, an SQL injection vulnerability was successfully discovered and fixed, averting a potential data-leak risk.

Value Delivered: From Efficiency Gains to Experience Optimisation

Quantifiable delivery returns

The JIABEI team's on-site service does not stop at finding problems; it also provides solutions. By taking part deeply in requirements reviews and the development process, early testing has shortened the client's delivery cycle by 20%, speeding up the pace of going live while safeguarding quality.

This cooperation is not only a successful practice of JIABEI Software's dual "on-site + cloud service" model, but also sets a new benchmark for the software testing industry in serving the real economy. As digital transformation accelerates, professional testing capability has become an important part of an enterprise's core competitiveness, and JIABEI Software keeps creating value for its customers through innovative technology and in-depth service.

Future Outlook: Building a Digital Quality Ecosystem

Quality cloud platform

JIABEI Software will build a customised "quality cloud platform" for Blue Origin, integrating automated testing, performance monitoring and defect analysis modules to enable elastic scheduling of testing resources and the accumulation and reuse of data assets, so that quality capabilities are steadily built up and can be reused.

"We look forward to exploring the new frontiers of intelligent testing together with Blue Origin. We will help more enterprises achieve the digital transformation goals of 'high quality, high speed and low cost'."

— CEO, JIABEI Software
← Back to case list