High-End Custom Software
13412889989
Business system development case · 2021-02-23

Beautkey Advertising System

The centralized service management platform of the Beautkey advertising system provides a unified service platform, reducing deployment and maintenance costs and integrating publishing and management.

Project overview

Playback terminals at each playback point can be controlled remotely through a web page; the system supports power-off, restart, clock synchronization, volume control and other functions for playback terminals including LED lintel screens, LCD electronic advertising screens, LCD televisions, electronic coffee tables, honour-wall television screens, phone mirroring, precious-metal display cabinets, business wayfinding, interactive tabletops, background-wall television screens, customer-experience phones, tablets and PC all-in-ones;

It can show the online status of remote playback terminals, and the playback status of the terminals can be checked after promotional material has been published. Unified data collection, review and publishing meet the needs of multi-level management. It supports multi-level distribution with a range of synchronization strategies and accommodates different network bandwidth requirements.

It enables three-tier management, approval and playback at the provincial branch, city branch and county sub-branch levels, and can limit the bandwidth and push time for media pushed to terminals. All information, data and devices are managed uniformly as a resource. Every operation should be logged, making it easier to maintain and extend the system centrally.

Interface showcase

Actual interface and delivered results