High-End Custom Software
13412889989
Business system development case · 2021-02-23

Hejide Monitoring System

The system uses an industrial PC or an industrial tablet as its server (on a local area network), with a CAN-to-Ethernet switch as the relay, transmitting data from our machines to the system over the CAN bus. It also reserves a communication interface for a Wi-Fi channel, so that other machine models can be supported. The system is compatible with four or more machine models, and each model has its own decoding method, as specified in the communication protocol.

Project overview

The technical details of the functions are as follows:

Real-time monitoring of machine operating status.

Real-time storage of machine operating data, with retrieval and export of historical data.

Manual control.

Real-time alarms.

Manual configuration.

Data transfer: data can be aggregated into the R&D database as required (optional feature), providing a data reference for the selection of machine components.

Multi-machine monitoring, single-machine operation, data storage and querying, and local network ID setup.

The system monitors machine operating status over long periods, so it must itself remain stable and reliable. There must be no significant latency or inaccurate data. If a machine goes offline or the network drops during operation, the system reconnects automatically, which helps record data over long periods without data loss or missing records and effectively improves the stability of the product.

Interface showcase

Actual interface and delivered results