High-End Custom Software
13412889989
App development case · 2021-02-23

Smart air purifier APP

Wireless connection: the smart air purifier hardware device connects to your phone over wireless technology.

Project overview

Mobile app control: the app on your phone acts as a remote control for switching the smart air purifier on and off and for selecting function modes.

Real-time air data: oxygen, carbon dioxide, PM2.5 readings, temperature and humidity — keep track of the air data in real time.

Function mode selection: sleep mode, powerful purification mode and auto purification mode — a range of mode options that suit different usage scenarios.

Interface showcase

Actual interface and delivered results