Bring large-model chat, enterprise knowledge and business data into one workspace. A unified entry point, private knowledge base, data connections and analytics dashboards, with role-based permissions aligned to your organization and phased delivery built on existing systems.
From chat and knowledge to data, analytics, R&D and organizational management, all modules share one account and permission system.
A unified chat interface with multi-model routing and switching, streaming responses, and saved conversation history. Choose a model by question type or let the system decide.
Upload and parse PDF, Word, Excel and PPT documents. Content is chunked and vectorized for semantic search and retrieval-augmented answers in chat.
Centrally configure API endpoints and authentication for ERP, WMS and other data sources, monitor status, and give analytics and chat a traceable data source.
Aggregate revenue, profit, orders and capacity into trend and distribution charts, with AI insight prompts and a live monitoring area for a quick read on data changes.
Enter coating thickness, temperature, line speed and other process parameters for quality prediction, then get parameter recommendations weighted by first-grade rate, energy use and stability.
Covers IPD stage workflows, project / requirement / review records, plus user, role, department and permission settings for day-to-day administration.
Sample screens of the platform modules, grouped for easy browsing.








Screenshots are from a demo environment. Figures, names and statistics are sample data and do not reflect actual operations. The Administration module covers users, role permissions and departments, not shown individually here.
Business systems and AI capabilities communicate through APIs; models and knowledge bases can be adjusted on demand, with minimal intrusion into existing systems.
Start with identity and chat, then add data and knowledge, then extend to specific business scenarios. The pace can be adjusted to your current setup.
Set up platform accounts and a unified AI chat entry so employees can get started in one interface.
Turn content scattered across systems and documents into searchable, citable data assets.
Build on existing data and permissions to extend into analytics, process and R&D scenarios.
Stage features can be combined to fit your existing systems and data foundation. Scope, timeline and acceptance criteria are subject to the agreed project assessment.
The platform bases permissions on your existing organization structure so data visibility matches job responsibilities.
Password and WeCom sign-in, JWT sessions and permission checks at the API layer.
Users, roles and departments are maintained hierarchically; org changes are reflected in permission settings.
Knowledge and business data visibility is set by department and role; chat results are filtered by the current account's permissions.
Private deployment or data masking can be assessed based on data sensitivity, with activity logs retained for audit.
Tell us about your current systems, data and permissions, and we'll provide an initial assessment.
Software Development Consultation
For online communication, please click Online Consultation
Consultation Hotline:
13412889989
