High-End Custom Software
13412889989
◆ Industrial AI visual inspection solution

Industrial AI Visual Inspection System

Deep-learning-based intelligent detection of PCB solder joint defects, replacing manual visual inspection.
One SMT line needs 4-8 fewer quality inspectors, saving hundreds of thousands in labor costs each year.

⚡ 0.1-second per-frame detection · 90% accuracy · missed-detection rate <0.1%
90%
Inspection accuracy
0.1s
Per-frame detection speed
24/7
Round-the-clock operation
50+
Businesses served

Three dilemmas of manual inspection

Is your factory struggling with these problems?

¥

Labor costs keep rising

Inspector wages, social insurance, meals and lodging, and management overhead are all expensive. Staff turnover, long training cycles, and shifting moods cause misjudgments, and night-shift rotation makes management harder.

▲

Missed defects cause heavy losses

Cold solder joints, bridged solder joints, and other defects flow downstream, causing batch rework, customer returns, and brand claims. Frequent complaints damage your company reputation.

⌘

Inconsistent standards, hard to trace

Different inspectors apply different levels of strictness, so the same batch can be judged in opposite ways. Quality data is scattered and cannot satisfy IATF 16949 or medical device audit requirements.

AI inspection system in operation

AI-powered inspection · Immediate cost savings and efficiency gains

The system automatically identifies PCB solder joint defects, runs 24 hours a day without interruption, and applies one permanent inspection standard, delivering quantifiable economic benefits.

  • ✓
    4-8 fewer quality inspectors Replaces several manual inspectors, saving hundreds of thousands in annual labor costs
  • ✓
    Missed-detection rate below 0.1% Reduces heavy after-sales losses from rework and claims
  • ✓
    Directly higher capacity Ultra-fast inspection never blocks the line, keeping the production takt flowing smoothly
  • ✓
    Traceable quality data Every PCB inspection result is fully recorded, so quality issues can always be verified

Comprehensive intelligent inspection

Covers the entire PCB solder joint inspection workflow and recognizes a wide range of defect types

◎

All defect types recognized

Automatically identifies cold solder joints, insufficient solder, excess solder, solder bridging, solder balls, pinholes, misalignment, hidden BGA defects, and many other solder joint problems

⌘

Real-time monitoring wall

A visual dashboard shows inspection progress, pass rate, top defect analysis, capacity trends, and other key metrics in real time

⌘

Automatic report export

Daily, weekly, and monthly reports are generated automatically. During a factory audit, every inspection record can be pulled up with one click, so quality traceability is always documented

⟳

Batch image inspection

Inspects multiple PCB images in sequence and automatically aggregates the results, greatly improving inspection efficiency

⌘

Visual annotation

Defect locations are automatically marked with red boxes, so repair technicians can go straight to the spot, reducing rework difficulty and workload

✦

Convenient admin console

A visual interface with one-click inspection start-up. No algorithm specialists are needed, and an ordinary operator can pick it up quickly

Real screenshots of the system

A clean, easy-to-use interface that makes quality management more efficient

Data dashboard
Data dashboard · Click for details
Real-time monitoring
Real-time monitoring · Click for details
Defect detection
Defect detection · Click for details
Model management
Model management · Click for details

Advanced technology · Stable and reliable

Deep learning algorithms trained on millions of real industrial samples

◉

Industrial-grade AI algorithms

Iterated on millions of real production-line PCB solder joint samples rather than a generic open-source model, with strong interference resistance in reflective, color-shifted, and low-light environments

⚡

Instant response

Each frame takes only 0.1 seconds to process, matching high-speed SMT lines. The system runs 24 hours a day with an extremely low failure rate

⊕

Flexible integration

Standard API and SDK interfaces complete MES/ERP integration in 3-7 days. On-premises deployment keeps data inside the factory intranet

⌘

Lightweight deployment

Runs on an ordinary industrial PC with no need for expensive high-end GPUs, and is compatible with the vast majority of industrial cameras, so existing hardware can be reused

⟳

Continuous iteration

New defect types raised by customers are added to the model free of charge, with long-term after-sales technical support and regular remote tuning, so you never need to build an in-house algorithm team

✧

Anomaly alerts

Built for the high temperatures and dust of a factory floor. Anomalies raise automatic pop-up alerts, and image dropouts or camera failures are reported in real time to keep production running without interruption

Worry-free service throughout

Flexible engagement models that lower your upfront investment

✧

Free on-site trial

Free on-site survey, sample testing, and a 7-day on-site trial. Work with us once you are satisfied

◉‍⚙

On-site deployment and training

Professional engineers deploy and commission the system on site and train your staff so they get up to speed quickly

⟳

Iterative updates

Model iteration and updates, fast remote after-sales support, and free optimization for newly added defect types

⌘

Flexible engagement models

Choose from a full hardware-and-software package, a software-only license, or per-line rental

Usher in a new era of intelligent inspection

Book a free demo today and see how AI inspection cuts costs and boosts efficiency

90%
Inspection accuracy
0.1s
Inspection speed
60%
Lower labor costs
24/7
Uninterrupted operation